Install the sealing cap screw of the hydraulic 1000 catties top body, and tighten the level to ensure that the piston rod moves easily on the full travel arrangement, without obstruction and the condition of light and weight asymmetry is appropriate. Screw too tight, will enhance friction resistance, accelerate damage; Too loose will result in oil seepage. Hydraulic 1000 catty top manufacturers have a reducing valve or exhaust pipe plug, automatic exhaust valve or exhaust pipe plug must be installed at a high level to remove gas. In the scheduling of diamond work in high temperature places, one end of the hydraulic 1000 jin top must be maintained fluctuation to avoid the harm of thermal deformation.
Before carrying out the proper installation of the card jack, it can be applied with ease. Can increase the use period of the top. If encounter in the whole process of installation cannot resolve a problem, can consult hotline at the same time, the enterprise develops specific guidance installation. When the hydraulic top is installed in the CNC lathe, be sure to pay attention to the parallelism and parallelism of the multi-function jack customized cylinder and machine guide rail, and the error should be within 0.1mm/ total length. If the length of the hydraulic busbar on the top of the deviation, the bottom of the support frame of the hydraulic top should be scraped or the contact area of the CNC lathe should be scraped to achieve the provisions. If the side busbar deviation, can loosen the hydraulic 1000 jin top and CNC lathe fixed screw, pull out the positioning pin, calibrate the precision of the side busbar.
The installation of the hydraulic jack top should be solid and reliable, the pipeline connection can not be loose, the installation surface of the cylinder and the rolling surface of the piston rod, the rack jack customized should maintain good parallelism and vertical Angle. For the hydraulic top of moving objects, the installation of the cylinder and moving objects in the abnormal surface fitness movement position to maintain parallel surface, the parallelism shall not exceed 0.05mm/ N.
Proper installation of hydraulic jacks can be applied with ease
Scan to enter the cell phone station