Wire rope electric hoist with compact structure. Light in weight and small in size. Practical operation is convenient and other features. Tensioning jacks can be installed independently in the empty frame I-beam, and supporting facilities can be installed in intelligent or manual single beam. Double beam. Hanging wall. Dragons and other lifting equipment application. The following preparations should be made before the construction of wire rope electric hoist project:
1. After the presence of wire rope electric hoist equipment, unpacking detection should be carried out to confirm whether there is damage in the middle of transportation. If there is damage, it should be installed immediately and applied.
2. Check the technical documents of the device to confirm subsequent documents of the device. Use instructions. Qualified certificates are complete, and carefully read the article application and installation instructions, review whether the equipment model specifications meet the requirements of the design scheme, and carry out safety and safety technology disclosure according to the project construction scheme.
3. Eliminate oil stains and antirust treatment oil on the tread surface of electric car.
4 in the installation of wire rope electric hoist before solving the process of inspection, mechanical jack supplier confirmed that the standard can be installed.
5. The cache devices on both sides of the rail or section steel must be fully installed.